Barrow Island – Project previously under Zenith Energy contract

Barrow Island – Project previously under Zenith Energy contract – Project previously under Zenith Energy contract

Zenith have operated and maintained the Chevron Barrow Island Central Power Station for WA Oil since 2008.

Project Background

Zenith Energy has operated and maintained the Chevron Barrow Island Central Power Station since 2008.

The island is located approximately 60km off the north-west coast of Western Australia (WA) and approximately 88km north of Onslow in the Carnarvon Basin.

Barrow Island is home to an oil production facility as well as one of the world’s largest natural gas projects, which produces over 2.1 billion cubic feet of natural gas daily and will continue to be an important pillar of the Australian economy (Chevron, 2022).

Zenith Energy is supplying a 21MW gas power generation solution and maintains the extensive high voltage distribution system on the Island.

Project name

Barrow Island – Project previously under Zenith Energy contract

Location

Barrow Island, Australia

Client

Chevron

Capacity

21 MW

Fuel source
Gas, Network Infrastructure
  • 3.7 MW

    BESS, Solar PV

    Peel

    Client: Nambeelup Kaadajan • Capacity: 3.7 MW

  • Environmental

    Batteries, Hybrid Renewable, Solar PV

    Eglinton Village Energy

    Client: Cedar Woods • Capacity: Forecast to include 4.4MW of rooftop solar arrays and a 6MWh BESS.

  • 101.5 MW

    BESS, Gas, Network Infrastructure

    Tanami

    Client: Newmont Mining Services • Capacity: 101.5 MW

Home

Case Studies

Halls Creek – Project previously under Zenith Energy contract

Halls Creek – Project previously under Zenith Energy contract – Project previously under Zenith Energy contract

Pantoro’s Halls Creek Project (Nicolsons Gold Mine) is a surface and underground mine located approximately 35 km south-west of Halls Creek in the remote Kimberley region of Western Australia.

Project Background

Pantoro’s Halls Creek Project (Nicolsons Gold Mine) is a surface and underground mine located approximately 35 km south-west of Halls Creek in the remote Kimberley region of Western Australia.

Pantoro is an Australian gold producer with its 100% owned Halls Creek Gold Project in the Kimberley Region of WA being the key operational focus. The project provides the company, a platform for growth through the operation of its first producing gold asset that includes open and underground pit mines along with a modern CIP Processing facility (Pantoro,2022).

Zenith is providing 7.5MW of power generation solution through the use of our diesel generation sets.

The power supply commenced in 2017.

Project name

Halls Creek – Project previously under Zenith Energy contract

Location

Halls Creek, Australia

Client

Pantoro

Capacity

7.5 MW

Fuel source
Diesel
CONTRACT

15-year Power Purchase Agreement (PPA)

COMMENCEMENT

Gas power station scheduled for Q1 2025, solar and BESS in Q3 2025.

  • 3.7 MW

    BESS, Solar PV

    Peel

    Client: Nambeelup Kaadajan • Capacity: 3.7 MW

  • Environmental

    Batteries, Hybrid Renewable, Solar PV

    Eglinton Village Energy

    Client: Cedar Woods • Capacity: Forecast to include 4.4MW of rooftop solar arrays and a 6MWh BESS.

  • 101.5 MW

    BESS, Gas, Network Infrastructure

    Tanami

    Client: Newmont Mining Services • Capacity: 101.5 MW