Superior Gold’s Plutonic Gold mine (the producing underground operation) is 800km north-east of Perth. It is one of the largest gold mines in Western Australia in terms of cumulative production, with both open pit and underground production.

Project Background

Superior Gold’s Plutonic gold mine (the producing underground operation) is 800km north-east of Perth. It is one of the largest gold mines in Western Australia in terms of cumulative production, with both open pit and underground production.

Superior Gold is listed under the TSX Venture exchange with 100% ownership and operation of the Plutonic Gold Operations that includes the Plutonic Gold mine.

Zenith is providing 16MW of power generation solution through the use of our gas generation sets.

The Plutonic Operation commenced production in 1990 and currently sources ore from the existing underground and open pit resources

Project name

Plutonic – Project previously under Zenith Energy contract

Location

Western Australia

Client

Superior Gold

Capacity

43.8 MW

Fuel source
Gas
  • 7.5 MW

    Diesel

    Halls Creek – Project previously under Zenith Energy contract

    Client: Pantoro • Capacity: 7.5 MW

  • 23 MW

    BESS, Gas, Solar PV

    Warrawoona

    Client: Calidus • Capacity: 23 MW

  • 21 MW

    Gas, Network Infrastructure

    Barrow Island – Project previously under Zenith Energy contract

    Client: Chevron • Capacity: 21 MW