We were pleased A remarkable story from Western Australia: gold from Bellevue Gold’s mine site has been selected for the restoration of St Paul’s Cathedral in London. This highlights the growing importance of responsibly produced and traceable metals.
Behind this story is a major renewable energy investment supporting Bellevue Gold’s operations. Zenith Energy built, owns and operates the 90MW Bellevue Gold hybrid power station, which includes four 6 MW Goldwind wind turbines, more than 47,000 solar panels incorporated into 5B‘s prefabricated racking technology, battery storage and thermal generation.
The power station brings together multiple technologies to support reliable mining operations while enabling high levels of renewable energy generation.
It’s a great example of how innovative energy infrastructure can support responsible resource production — connecting a remote mine in Western Australia with a project of global significance.
Congratulations to Bellevue Gold and all their partners to produce ‘green gold’ and be recognised on the global stage.
Read the full story from RenewEconomy: Australian renewable-powered mine to supply “green gold” for repairs to London’s St Paul’s Cathedral












