The second of four wind turbines has now been assembled at the Bellevue Gold Project, bringing us one step closer to delivering one of Australia’s most advanced off-grid hybrid power stations.
With 24 MW of wind, 27 MW of solar, and a 15 MW / 33 MWh BESS, the system is designed to enable multiple day engine-off operation powered by 100% instantaneous renewable energy when conditions allow — supporting Bellevue’s goal to become the first net zero gold producer in Australia.












