The second of four wind turbines has now been assembled at the Bellevue Gold Project, bringing us one step closer to delivering one of Australia’s most advanced off-grid hybrid power stations.
With 24 MW of wind, 27 MW of solar, and a 15 MW / 33 MWh BESS, the system is designed to enable multiple day engine-off operation powered by 100% instantaneous renewable energy when conditions allow — supporting Bellevue’s goal to become the first net zero gold producer in Australia.
Blogs, ESG, In the News, News
2nd Wind Turbine Up At Bellevue
2nd turbine up at Bellevue
May 14, 2025
7min